How to Relocate UPS Power Supply Host and Lithium Ion Battery in Computer Room?

In order to ensure the continuous, reliable, safe and scientific smooth transition of the computer room monitoring network operation system, the UPS battery relocation work must strictly implement a scientific, reasonable and orderly relocation plan, and complete the relevant work in a short time, which is very challenging. The following small series of energy storage and electricity share the steps and measures of relocation of lithium ion battery UPS host in the computer room.
1. first understand the UPS host and battery equipment
The UPS host and lithium-ion battery are operating normally, but the service life of the UPS battery pack has exceeded its service life. In order to prevent the aging of lithium-ion batteries, the impact on the operation of the UPS host power supply system after relocation and the guarantee of UPS backup time.
2. Make relocation planning
On-site investigation → on-site communication with Party A's technical personnel → determination of implementation method → analysis of equipment → formulation of emergency method. The UPS power supply process for lithium-ion batteries is important to be formulated according to the requirements before relocation. It is important to have a detailed understanding of the current system equipment and system operation. Develop detailed relocation methods and emergency response methods based on the understanding of the situation.
Engineers understand the current situation of the user's computer room and the specific requirements after relocation. Fully consider the various situations that may occur in the execution process, and customize the detailed and feasible migration execution plan to minimize the impact of the migration of the computer room on users.
In the process of relocation, the technical personnel of UPS manufacturer should cooperate closely.
In order to ensure the smooth, orderly and safe relocation work, detailed relocation process will be formulated, detailed division of labor will be carried out, and specific work arrangements will be assigned to people and responsibilities will be assigned to people.
3. Personnel organization arrangement
The computer room information center is responsible for the overall coordination of the UPS battery relocation work, and a relocation commander is set up.
The specific division of labor is as follows:
Commander-in-Chief
Be responsible for implementing the work progress of each unit according to the time schedule of the relocation method, coordinating the interconnection of the work of each unit, adjusting the situation in time, and coordinating the overall command of the relocation work.
Computer Room Construction Working Group
According to the requirements of the battery (12 groups, a total of 256 sections) one by one in place.
Equipment Relocation Working Group
Responsible for the relocation of safe, intact and complete equipment (batteries). After dismantling from the original machine room, gently move and transport them into the new machine room, and place the equipment (batteries) and connect them in place accordingly.
Equipment Commissioning Working Group
It is composed of engineers from the original equipment maintenance unit, responsible for the shutdown of the original lithium ion battery UPS, the detection and debugging of UPS lines and performance.
4. Formulate execution time
Due to the large number of replaced batteries, the weight of the battery is also relatively heavy; and considering the construction conditions of the site, the installation work has a certain degree of difficulty, plus the preparation work before installation and the commissioning work after installation, so a certain amount of construction time should be given.
5. Steps for dismantling UPS
The UPS and battery to be relocated shall be self-checked, and the battery connection line from primary battery to new battery shall be laid.
Shut down the lithium-ion battery UPS, measure the voltage with a multimeter, and confirm that the input and output are open and disconnected.
The battery switch is closed. Disassembled UPS host and battery are transported separately.